November 2005

Aerial view of the stack and baghouse area.

Circulating Water pipe is installed and backfilled.

The Heater Building area is excavated.

Circulating Water Pipe is installed.

Pilings are installed in the Steam Generator area.
Next: December 2005
Back to Photos of Nebraska City 2 Construction
|