December 2005

Piling installation in the Mill area.

Installation of the wastewater sump pit.

Circulating Water Pipe installation at the Cooling Tower location.

Mud mat being poured for the Steam Turbine Generator pilings.

Turbine and Mill areas.
Next: January 2006
Back to Photos of Nebraska City 2 Construction
|