January 2006

Oil Water Separator piping connected to the Wastewater Sump.

The Steam Turbine Generator foundation was poured in the lower elevation section.

The Steam Turbine Generator foundation was poured in the lower elevation section.

View of the new Water Treatment area.

Turbine Generator base mat rebar installation.

Mill area

Steam Turbine Generator Base Mat Pour
Next: February 2006
Back to Photos of Nebraska City 2 Construction
|