|
The Contactor newsletter is used to communicate with contractors we do business with on a daily basis. Newsletters are sent out intermittently when a pertinent change is made to the metering specifications manual or other practices and procedures. Below are links to recent newsletters for your review.
Your feedback is important to us. If you have questions or comments please email us at Contactor@oppd.com.
Contactor Newsletter
- May 2013 Issue – Meter Manual Updates
- February 2013 Issue – Metro area electric service designer (ESD) territory changes
- January 2013 Issue - Farm Meter Assembly
- August 2012 Issue - Meter Manual updates; generation installation guidelines; transformer slab details; lever bypass
- August 2011 Issue - House service pre-connect policy
- June 2011 Issue - Flood disconnect policy; new electrical service designer territory maps
- April 2011 Issue - New underground dip rates
- December 2010 Issue - 200 amp underground meter socket specifications; underground temporary service posts
- September 2009 Issue - Meter socket slip joint riser installations; new meter specification formats
- April 2009 Issue - New guidelines: underground dips; new meter specifications manuals; lighting incentive pilot program
- June 2008 Issue - Underground dips; temporary poles; lever bypass; all equipment on transformer (AEOT)
- May 2007 Issue - Territory maps; new residential underground dip process
- January 2007 Issue - Gaining access for measuring cable lengths; bypass lever
- October 2006 Issue - OPPD no longer supplies Sealtight/liquidtight assemblies for underground temporary services
- April 2006 Issue - OPPD will enforce Section 4.08, meter locations of the Meter Specification Manual
- March 2006 Issue - OPPD no longer supplies meter sockets and slip-joint risers
Meter Specification Manual
|