Contactor Newsletter Archives

  May 2007 Issue

Territory Map

The Papillion Center ESD territories have recently changed.  This map (PDF document opens in new window - zoom in/out available) identifies the appropriate ESD to contact for your electrical project coordination. 


Revised Residential Underground Dip Process

(Applies to existing overhead services that customers want buried)

Starting May 1st, residential customers with overhead service will be required to install duct for OPPD service cables if they want the service buried.  OPPD crews will pull cable into this duct, make connections, and install meter.  The new fee for residential underground dips will be $450.00.  

An on site meeting is required with an Electric Service Designer to identify the conduit route, OPPD pole location, and identification of pedestal requirement and review spec details as follows:

  • Install a 2 1/2" schedule 40 conduit between the pole or pedestal and the meter location on the house.  3" conduit is required for 320 amp sockets.
  • Conduit must be installed a minimum of 24" deep with no more than (2) 90 degree bends. The bends must be 36" sweeps at each end of the conduit.
  • A slip joint must be installed at the meter socket to allow for movement without pulling the socket off the house.
  • If a pedestal is involved, stop the conduit within 2’ of the pedestal and leave the trench open at this end so OPPD can extend the conduit into the pedestal. Tape the conduit end closed so dirt and debris cannot wash in.
  • Install (1) 1" conduit in the same trench for cable television.  If the customer has Qwest telephone they should check with Qwest to determine if an additional conduit should be installed.
  • A 200 lb rated poly pulling string must also be installed in each conduit.
  • The customer is responsible for coordination and fees associated with phone and cable installation and overhead service removal.
  • Notify the Electric Service Designer when the duct and string are installed and ready for cable installation and electrical inspections are complete. 

Please refer questions to OPPD’s Consumer Sales & Service Department @ 552-5339.

Return to Contactor Archives page

 

Meter Manual

OPPD's Meter Manual contains specifications and drawings. The manual supplies key information to customers, employees, architects, engineers, contractors and others.