Oil Water Separator piping connected to the Wastewater Sump.
|

The Steam Turbine Generator foundation was poured in the lower elevation section.
|

The Steam Turbine Generator foundation was poured in the lower elevation section. |

View of the new Water Treatment area.
|
|

Turbine Generator base mat rebar installation.
|

Mill area
|

Steam Turbine Generator Base Mat Pour
|
|
|